Operating China generator set requires strict adherence to safety regulations to ensure the safety of personnel and the lifespan of the equipment. The following information is provided for user reference.
1. Pre-Operation Inspection
Visual checks: Examine the China generator set for fuel/oil leaks, loose connections, or physical damage.
Fluid levels: Verify coolant, engine oil, and battery charge status before ignition.
2. Startup Protocols
Ventilation: Deploy the China generator set in well-ventilated areas to prevent carbon monoxide buildup.
Load sequencing: Engage loads gradually after stable voltage output is achieved.
3. Runtime Monitoring
Performance indicators: Track exhaust color (ideal: light transparent) and abnormal vibrations from the China generator set.
Overload prevention: Never exceed 80% of rated capacity for prolonged operation.
4. Shutdown & Maintenance
Cool-down phase: Allow the China generator set to idle for 3-5 minutes before turning off to stabilize temperatures.
Post-use inspection: Clean air filters and document operational logs for maintenance records.
5. Emergency Response
Fault escalation: Immediately shut down the China generator set if sparking, excessive smoke, or irregular noises occur.
Fire preparedness: Keep Class B/C fire extinguishers accessible near the installation site.
The safe operation procedures for China generator set have been introduced above, and it is hoped that they can serve as a reference for users.